1. Nowadays, many battery car charging piles are wholesaled by manufacturers, and the wholesale price through manufacturers will be reduced.For operators who want to buy charging piles, it is very cost-effective to wholesale from manufacturers.
2. ATE-8603 switching power supply automatic test system (DC-DC) is suitable for the characteristic test of switching power supply such as AC/DC or DC/DC power supply, adapter, battery charger, etc. It is tailor-made and optimized for standard test items. It has good test performance and meets a large number of Production test requirements.
3. The charging pile detection equipment recommends the XL-942S/943S charging pile on-site characteristic tester, which can meet the test needs of metrology verification, interoperability detection and protocol consistency detection, and meet the requirements of the testing items in the acceptance stage and operation stage of the national network. And the equipment is highly integrated and portable.
1. First of all, the AC charging pile test project includes the appearance inspection and functional test of the charging pile. The testers will carefully check the appearance of the charging pile, including the integrity of the shell, whether the connector is intact, whether the display and buttons are normal, etc.
2. Charging pile detection project function test: charging function control test, communication function test, insulation detection function test, vehicle plug locking function test, pre-charging function test.
3. It can provide reliability test item services: environmental reliability test, electromagnetic compatibility EMC test, and IP protection level test, etc. Common reliability test services include: vibration, impact, drop, high and low temperature, salt spray test, as well as mold, photoaging and other experiments, and nationally recognized CMA test reports are issued.
XL-942S charging pile test equipment cooperates with XL-3603 load to meet the test requirements of metrology verification, interoperability detection and protocol consistency detection, and meet the requirements of testing projects in the acceptance stage and operation stage of State Grid Document No. 45.
Reliability can provide some test item services: environmental reliability test, electromagnetic compatibility EMC test, and IP protection level test, etc. Common reliability test services include: vibration, impact, drop, high and low temperature, salt spray test, as well as mold, photoaging and other experiments, and nationally recognized CMA test reports are issued.
"JJG 1149-2018 Electric Vehicle Non-vehicle Charger Verification Regulations" Test Project. JJG 1148-2018 Electric Vehicle Non-vehicle Charger Verification Procedures" Test Project. GB/T 34651-2017" Conduction Charging Interoperability Test Project.
What is the main test of the charging pile test? What is the main test of the charging pile test? What is the main test of the charging pile test? There are two main directions for charging pile testing, one is the test project of electrical parameters, and the other is the test project of compatibility.
Binance exchange-APP, download it now, new users will receive a novice gift pack.
1. Nowadays, many battery car charging piles are wholesaled by manufacturers, and the wholesale price through manufacturers will be reduced.For operators who want to buy charging piles, it is very cost-effective to wholesale from manufacturers.
2. ATE-8603 switching power supply automatic test system (DC-DC) is suitable for the characteristic test of switching power supply such as AC/DC or DC/DC power supply, adapter, battery charger, etc. It is tailor-made and optimized for standard test items. It has good test performance and meets a large number of Production test requirements.
3. The charging pile detection equipment recommends the XL-942S/943S charging pile on-site characteristic tester, which can meet the test needs of metrology verification, interoperability detection and protocol consistency detection, and meet the requirements of the testing items in the acceptance stage and operation stage of the national network. And the equipment is highly integrated and portable.
1. First of all, the AC charging pile test project includes the appearance inspection and functional test of the charging pile. The testers will carefully check the appearance of the charging pile, including the integrity of the shell, whether the connector is intact, whether the display and buttons are normal, etc.
2. Charging pile detection project function test: charging function control test, communication function test, insulation detection function test, vehicle plug locking function test, pre-charging function test.
3. It can provide reliability test item services: environmental reliability test, electromagnetic compatibility EMC test, and IP protection level test, etc. Common reliability test services include: vibration, impact, drop, high and low temperature, salt spray test, as well as mold, photoaging and other experiments, and nationally recognized CMA test reports are issued.
XL-942S charging pile test equipment cooperates with XL-3603 load to meet the test requirements of metrology verification, interoperability detection and protocol consistency detection, and meet the requirements of testing projects in the acceptance stage and operation stage of State Grid Document No. 45.
Reliability can provide some test item services: environmental reliability test, electromagnetic compatibility EMC test, and IP protection level test, etc. Common reliability test services include: vibration, impact, drop, high and low temperature, salt spray test, as well as mold, photoaging and other experiments, and nationally recognized CMA test reports are issued.
"JJG 1149-2018 Electric Vehicle Non-vehicle Charger Verification Regulations" Test Project. JJG 1148-2018 Electric Vehicle Non-vehicle Charger Verification Procedures" Test Project. GB/T 34651-2017" Conduction Charging Interoperability Test Project.
What is the main test of the charging pile test? What is the main test of the charging pile test? What is the main test of the charging pile test? There are two main directions for charging pile testing, one is the test project of electrical parameters, and the other is the test project of compatibility.
575.34MB
Check626.56MB
Check966.91MB
Check198.99MB
Check343.77MB
Check296.55MB
Check694.64MB
Check741.82MB
Check459.81MB
Check818.18MB
Check575.94MB
Check275.31MB
Check416.64MB
Check791.93MB
Check853.44MB
Check548.78MB
Check487.38MB
Check537.67MB
Check866.83MB
Check845.44MB
Check512.22MB
Check297.96MB
Check781.65MB
Check231.32MB
Check847.53MB
Check423.61MB
Check151.83MB
Check482.18MB
Check431.84MB
Check891.33MB
Check246.82MB
Check161.22MB
Check918.53MB
Check898.24MB
Check834.65MB
Check894.58MB
CheckScan to install
Binance exchange to discover more
Netizen comments More
2842 冰解冻释网
2025-01-23 02:04 recommend
2934 供认不讳网
2025-01-23 02:04 recommend
2538 妙算神机网
2025-01-23 01:28 recommend
875 老僧入定网
2025-01-23 01:06 recommend
1132 通宵达旦网
2025-01-22 23:59 recommend